Metrolink Single Track Extension

Plocher Construction was responsible for the construction of three major bridge structures as part of a critical transportation infrastructure project. The scope included the completion of the Rieder Road Bridge and Little Silver Creek Bridge, with the Silver Creek Bridge finalized shortly thereafter. Bridge work involved cast-in-place (CIP) deck construction, parapet installation, and waterproofing systems.

Foundation work included the drilling and installation of 118 deep shafts to support the Overhead Contact System (OCS), along with the construction of seven change order CIP box culverts to accommodate revised drainage and load requirements.

In addition to bridge structures, Plocher executed the installation of underground electric systems and placed sub-ballast for future track installation. The project was sequenced to enable turnover of the majority of the mainline corridor to the Systems Contractor on schedule.

Final project phases included construction of the station platform and plaza areas, integrating site civil improvements with structural elements to support future transit operations.

Safety First. Always.

At Plocher Construction, safety isn’t just a policy—it’s a core value. Our safety manager works closely with our highly trained and empowered field teams to maintain an industry-leading safety record. We believe that every worker deserves to go home safe, and our commitment to providing an uncompromisingly safe work environment is rooted in our responsibility to our employees and their families. Our exceptional safety performance is reflected in our consistently low Experience Modification Rate (EMR).

Proactive Risk Management

We identify potential hazards before they become problems. Site inspections, hazard analyses, and safety meetings help protect our people and projects.

Ongoing Training & Certification

From OSHA standards to specialized equipment operation, our teams undergo continual safety training to stay sharp, compliant, and confident in every work zone.

Data-Driven Safety Performance

We track key safety metrics—including our top-tier EMR—to reduce incidents, lower risk, and ensure peace of mind on every job.

A Look at Our Evolving Project Capabilities

Plocher Construction has expanded its services since the launch of the company in the early 1990s. Creating a more diverse range of available services, these current projects exhibit the different skills and capabilities of our team members.

Recent Projects